ICC IEBC-2018 – 2018 International Existing Building Code

$30.00

50% OFF SALE ENDS IN:

  •  PDF Format
    PDF stands for "Portable Document Format." It was originally developed by Adobe in 1993 and is the most common file format used today for everything from business reports and academic papers to ebooks and digital magazines. PDF files can be viewed, printed, and shared across different platforms and devices, including Windows, Mac, Linux, iOS, and Android.

    You will be able to download to your computer or mobile device immediately following checkout, and also receive an order confirmation email with the link to access again in the future.*

    *NOTE: Some email providers may filter the order confirmation email into your junk/spam folder. If you do not receive it within a few minutes, please check there first.
  •  Ask a Question

    ICC IEBC-2018 - 2018 International Existing Building Code

    $30.00

    Ask a Question



      Share
    Shop with Confidence Trust
    Brand:

    International Code Council

    Format:

    PDF (Portable Document Format)

    ISBN:

    9781609837525

    Pages:

    321

    Released:

    2017

    Encourages the use and reuse of existing buildings. This code covers repair, alteration, addition and change of occupancy for existing buildings and historic buildings, while achieving appropriate levels of safety without requiring full compliance with the new construction requirements contained in the other I-Codes. For the most current adoptions details go to International Code Adoptions

    Key changes include:

    • Section 410 Accessibility has been relocated to a new Section 305. Chapters 4, 5, 6, 13 and 14 have been relocated resulting in a reorganization and new chapter numbering.
    • Requirements for live loads from Chapters 4 and 8 have been combined and placed in Chapter 3 to apply for all compliance methods.
    • Structural components damaged by snow events must be repaired assuming snow loads for new buildings from the IBC.
    • A new exception is added for loading of existing structural elements next to an addition in buildings designed using the IRC.
    • When a work area includes more than half the building in an alteration, wall anchors must be installed at the roof line along reinforced concrete and masonry walls.
    • Buildings undergoing a change of occupancy shall have live, snow, wind and seismic loads checked. Design loads are based on IBC-level forces.
    • When a change of occupancy occurs placing a building in a higher risk category, the seismic loads on the building must be evaluated using IBC-level forces. Access to the building must be maintained when passing through or near other buildings and structures.
    • Where storm shelters are required based on IBC and ICC 500 for Group E Occupancies, any addition to such existing occupancies where the occupant load of the addition is 50 or more will trigger the construction of a storm shelter.
    • Carbon Monoxide provisions have been added in the Prescriptive Method Additions, Alterations Level 2 Additions, and in Additions for I-1, I-2, I-4 and R Occupancies.
    • Emergency Escape and Rescue Opening provisions related to being operational have been added to Prescriptive Compliance Method and Alterations Level 1.
    • Single exit buildings and spaces under Alteration Levels 2 and 3 have been modified to be more consistent with the IBC.
    • The Alterations Level 2 requirement that water for automatic fire sprinkler system be available at the floor of alteration without the need for a fire pump has been moved to Chapter 9 for Alterations Level 3 and the fire pump criterion was deleted.