ASME BPVC.III.3-2023 – 2023 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Division 3: Containment Systems and Transportation Packaging of Spent Nuclear Fuel and High-Level Radioactive Waste
$500.00 $250.00
- PDF FormatPDF stands for "Portable Document Format." It was originally developed by Adobe in 1993 and is the most common file format used today for everything from business reports and academic papers to ebooks and digital magazines. PDF files can be viewed, printed, and shared across different platforms and devices, including Windows, Mac, Linux, iOS, and Android.
You will be able to download to your computer or mobile device immediately following checkout, and also receive an order confirmation email with the link to access again in the future.*
*NOTE: Some email providers may filter the order confirmation email into your junk/spam folder. If you do not receive it within a few minutes, please check there first. - Ask a Question
ASME BPVC.III.3-2023 - 2023 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Division 3: Containment Systems and Transportation Packaging of Spent Nuclear Fuel and High-Level Radioactive Waste
$500.00$250.00Ask a Question
Brand: | ASME International |
---|---|
Format: | PDF (Portable Document Format) |
ISBN: | 9780791875759 |
Pages: | 330 |
Released: | 2023 |
ASME BPVC-III-3, 2023 Edition, July 1, 2023 – SECTION III: RULES FOR CONSTRUCTION OF NUCLEAR FACILITY COMPONENTS DIVISION 3, CONTAINMENT SYSTEMS FOR TRANSPORTATION AND STORAGE OF SPENT NUCLEAR FUEL AND HIGH-LEVEL RADIOACTIVE MATERIAL
Section III, Division 3 – This Division contains requirements for the design and construction of the containment systems for nuclear spent fuel or high-level radioactive material transport packaging.
What are the key changes for 2023 BPVC Section III, Division 3 (ASME BPVC-III-3)?
- WB-2321.2, WC-2321.2, and WD-2321.2 have been revised to remove requirement to use full-size test specimens, and test-specimen requirements were adjusted to be in accordance with SA-370.