ASME BPVC.III.2-2023 – 2023 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Division 2: Code for Concrete Reactor Vessels and Containments

$250.00

50% OFF SALE ENDS IN:
  •  PDF Format
    PDF stands for "Portable Document Format." It was originally developed by Adobe in 1993 and is the most common file format used today for everything from business reports and academic papers to ebooks and digital magazines. PDF files can be viewed, printed, and shared across different platforms and devices, including Windows, Mac, Linux, iOS, and Android.

    You will be able to download to your computer or mobile device immediately following checkout, and also receive an order confirmation email with the link to access again in the future.*

    *NOTE: Some email providers may filter the order confirmation email into your junk/spam folder. If you do not receive it within a few minutes, please check there first.
  •  Ask a Question

    ASME BPVC.III.2-2023 - 2023 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Division 2: Code for Concrete Reactor Vessels and Containments

    $250.00

    Ask a Question



      Share
    Shop with Confidence Trust
    Brand:

    ASME International

    Format:

    PDF (Portable Document Format)

    ISBN:

    9780791875742

    Pages:

    241

    Released:

    2023

    ASME BPVC-III-2, 2023 Edition, July 1, 2023 – SECTION III: RULES FOR CONSTRUCTION OF NUCLEAR FACILITY COMPONENTS- DIVISION 2 – CODE FOR CONCRETE CONTAINMENTS

    Section III, Division 2 – This Division contains requirements for the material, design, construction, fabrication, testing, examination, and overpressure protection of concrete containment structures, pre-stressed or reinforced. These requirements are applicable only to those components that are designed to provide a pressure retaining or containing barrier. They are not applicable to other support structures, except as they directly affect the components of the systems. This Section contains appendices, both mandatory and non-mandatory, for Division 2 construction.

    What are the key changes for 2023 BPVC Section III, Division 2 (ASME BPVC-III-2)?

    • CC-2331.2, CC-3532.1.7, Table CC-4333-1, and Table D2-VIII-1410-1’s requirements, related to ASTM A615-20, have been updated to align with the current material requirements and grade options listed in the most current ASTM standard.
    • CC-2466.2, now includes a “Note” to clarify what constitutes a change in heat treatment conditions when pre-stressing element materials.
    • CC-2522.1.2 has been revised to remove requirement to use full-size test specimens, and test-specimen requirements were adjusted to be in accordance with SA-370.
    SKU: BPVC.III.2-2023 Brands: ,
    My Cart
    Close Wishlist
    Close Recently Viewed
    Categories