ASME BPVC.III.1.NE-2023 – 2023 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Division 1, Subsection NE: Class MC Components

$250.00

50% OFF SALE ENDS IN:
  •  PDF Format
    PDF stands for "Portable Document Format." It was originally developed by Adobe in 1993 and is the most common file format used today for everything from business reports and academic papers to ebooks and digital magazines. PDF files can be viewed, printed, and shared across different platforms and devices, including Windows, Mac, Linux, iOS, and Android.

    You will be able to download to your computer or mobile device immediately following checkout, and also receive an order confirmation email with the link to access again in the future.*

    *NOTE: Some email providers may filter the order confirmation email into your junk/spam folder. If you do not receive it within a few minutes, please check there first.
  •  Ask a Question

    ASME BPVC.III.1.NE-2023 - 2023 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Division 1, Subsection NE: Class MC Components

    $250.00

    Ask a Question



      Share
    Shop with Confidence Trust
    Brand:

    ASME International

    Format:

    PDF (Portable Document Format)

    ISBN:

    9780791875711

    Pages:

    179

    Released:

    2023

    ASME BPVC-III NE, 2023 Edition, July 1, 2023 – SECTION III: RULES FOR CONSTRUCTION OF NUCLEAR FACILITY COMPONENTS – DIVISION 1 – SUBSECTION NE – CLASS MC COMPONENTS

    Section III, Division 1, Subsection NE – This Subsection contains requirements for the material, design, fabrication, examination, testing and overpressure protection of items which are intended to conform to the requirements for Class MC construction. The rules of Subsection NE cover the requirements for assuring the structural integrity of items.

    What are the key changes for 2023 BPVC Section III, Division 1, Subsection NE (ASME BPVC-III NE)?

    • NE-2321.2 has been revised to remove the requirement to use full-size test specimens, and test-specimen requirements were adjusted to be in accordance with SA-370.
    • NE-3125 has been updated to permit the use of Section XI, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities, as a basis for designing for inservice monitoring and nondestructive examination (NDE).
    • NE-5540 has been developed to permit the use of CP-189 as an acceptable NDE personnel qualification standard. Section III, previously required qualification of examiners only to SNT-TC-1A, while Section XI, requires personnel qualification per CP-189.
    SKU: BPVC.III.1.NE-2023 Brands: ,
    My Cart
    Close Wishlist
    Close Recently Viewed
    Categories